| DESCRIPTION |
CLIENTS |
STATUS |
| Calibration of Clamp Meter |
Rotorniaga Sdn Bhd |
Completed |
| To Supply Manpower |
Wazam Venture Sdn Bhd |
Completed |
| To Supply Technical Report |
Wazam Venture Sdn Bhd |
Completed |
| To Supply IR Test |
Wazam Venture Sdn Bhd |
Completed |
| To Supply manpower , tools, equipment and consumable to repair transformer & busduct |
Kertih Terminals Sdn Bhd |
Completed |
| To PerformTransformer T101C3 and relay at Switchgear CB101C3 testing |
Petronas Chemical Derivatives Sdn Bhd |
Completed |
| To Supply Rental Test Kit for Lundin |
Kencana Jaya Mas Sdn Bhd |
Completed |
| To Supply Manpower for Visiting ST's Competent Electrical |
Integrated Mie Sdn Bhd |
Completed |
| To provide combined OC and EF |
Prisma Nilam Sdn Bhd |
Completed |
| Maintenance of IR Thermography of switchgear |
Kertih Terminals Sdn Bhd |
Completed |
| Supply of Manpower, tools, equipment and consumable to replace Busduct |
Kertih Terminals Sdn Bhd |
Completed |
| Installation and Calibration Over current and Earth Fault Relay |
ETD Makmur (M) Sdn Bhd |
Completed |
| To Supply Entes and Delab Protection Relay |
Eaglesiede Synergy Sdn Bhd |
Completed |
| To check underground cables 22kV RMU and to Replace termination kit for 22kV RMU |
Kemaman Bitumen Company Sdn Bhd |
Completed |
| Relay Calibration MPR REF542 at PCOGD |
ETD Makmur (M) Sdn Bhd |
Completed |
| Relay Verification/Calibration onshore Non O&G OC/OCEF/EF/TOR And LV Capacitor Bank Commissioning |
ETD Makmur (M) Sdn Bhd |
Completed |
| To Provide Power Meter / Power analyzer verification (Polarity,Wiring, Functional) |
Wazam Venture Sdn Bhd |
Completed |
| Recalibration for Protection Relay at Plant 5, Plant 9, Plant 8 and Berth 6 |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
| To Supply ELR Calibration for DB |
Esteem Energy Engineering Sdn Bhd |
Completed |
| To Provide 6 months Report to the Energy Commission |
Arkema Thiochemicals Sdn Bhd |
Completed |
| To Calibrate Motor Protection Relay |
Kertih Terminals Sdn Bhd |
Completed |
| To Perform TDR for LV Cable Fault |
Esteem Energy Engineering Sdn Bhd |
Completed |
| Provision of professional & Service Engineer |
ABB Malaysia Sdn Bhd |
Completed |
| Relay Verification/Calibration onshore Non O&G OC/OCEF/EF/TOR |
Alam Dingin Engineering Sdn Bhd |
Completed |
| To Supply Manpower for Earthing Rectification Work at PPTSB |
Esteem Energy Engineering Sdn Bhd |
Completed |
| To Supply Voltage Monitoring Relays |
Kemaman Bitumen Company Sdn Bhd |
Completed |
| Relay Verification/Calibration onshore Non O&G OC/OCEF/EF/TOR |
Alam Dingin Engineering Sdn Bhd |
Completed |
| To Supply Current Monitoring Relay |
Paka Plant General Maintenance Sdn Bhd |
Completed |
| Recalibration for Protection Relay |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
| Testing two transformers in Sub 5 in TK |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
| To supply High Bay Light (EX) LED 80W for TTLR Terminals |
Kertih Terminals Sdn Bhd |
Completed |
| To Supply & Install Substation Signs |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
| ST Registration of Gen Set |
HRSB Power Control Sdn Bhd |
Completed |
| Relay Calibration / Verification onshore non O&G |
TOPAZ Integrated Technology Sdn Bhd |
Completed |
| Relay Calibration / Verification onshore non O&G |
HRSB Power Control Sdn Bhd |
Completed |
| Supply Entes CKR-93T 144x144 85-265 VAC / DC Overcurrent Protection Device |
Eaglesiede Synergy Sdn Bhd |
Completed |
| Provision of Energy Manager for TCOT |
RAM-Bytes Sdn Bhd |
Completed |
| Installation of Variable Speed Drive and Soft Starter |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
| Calibration for Faulty Relay on ELR Onshore |
Destini Oil Services Sdn Bhd |
Completed |
| Provision of Professional & Service at Petronas Chemical Derivatives Sdn Bhd |
ABB Malaysia Sdn Bhd |
Completed |
| Energy Audit for Malay Sino |
Malay-Sino Chemical Industries Sdn Bhd |
Completed |
| Energy Audit for PPTSB |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
| Relay Calibration and Switchgear Maintenance for Bertam (Lundin) |
Kencana Jaya Mas Sdn Bhd |
Completed |
| Manpower support for Optimal VFD upgrade |
ABB Malaysia Sdn Bhd |
Completed |
| OC, OCEF,EF & TOR Recalibration Protection Relay |
Alam Dingin Engineering Sdn Bhd |
Completed |
| EPCC MPR Upgrade Panel 3.3kV (Westing House to ABB REM610) |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
| Manpower supply for Training / Tech Support - OGT Relay Calibration |
RAM-Bytes Sdn Bhd |
Completed |
| Voltage Monitoring Relay Engineering and Supply |
Kemaman Bitumen Company Sdn Bhd |
Completed |
| Supply of Ex LED for KTSB Lighting Improvement |
Kertih Terminals Sdn Bhd |
Completed |
| OC, OCEF,EF & TOR Recalibration Protection Relay |
Alam Dingin Engineering Sdn Bhd |
Completed |
| Hv &Lv OCEF, EFR Recalibration Protection Relay |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
| Current Monitoring Relay Engineering and Supply for Optimal |
Paka Plant General Maintenance Sdn Bhd |
Completed |
| Transformer J & K Testing |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
| Periodic Inspection by Supervising Engineer |
Kertih Terminals Sdn Bhd |
Completed |
| ST Registration of Gen Set |
HRSB Power Control Sdn Bhd |
Completed |
| Provision for EMEER at 2017 |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
| Relay Calibration ELR-OGT |
Topaz Integrated Technology Sdn Bhd |
Completed |
| Supply & Calibration Relay for OGT |
RAM-Bytes Sdn Bhd |
Completed |
| Supply of Emerson Parts |
Solve Tech Industrial Sdn. Bhd |
Completed |
| Gen Set Relay Calibration |
HRSB Power Control Sdn Bhd |
Completed |
| EPCC VFD including Cable laying & Panel installation |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
| Supply of SP Emerson Parts |
MYD Technology Sdn. Bhd |
Completed |
| Endorsement for relay cert for PCOGDSB |
MAIA Energy Sdn Bhd |
Completed |
| Supply of Entes CKR-93T Relay |
Eaglesiede Synergy Sdn Bhd |
Completed |
| Provision of Competent Engineer |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
| Supply of Emerson Parts |
Solve Tech Industrial Sdn. Bhd |
Completed |